Lindelacr metalwork is a leading manufacturer of metal ceiling and facade systems.

Metal ceiling & facade for African airports, hospitals, malls, and public halls Ask professional custom service

Leading metal ceiling manufacturer · Foshan export

Custom Metal Facade Systems for African Projects

Hot-humid terminals, hospitals, and long-span halls need solid aluminum that holds a return after wind and a coating that survives the voyage. LINDELACR packs labelled lots from Foshan: 3003-H14, 2.0–3.0 mm, PVDF ≥ 30 μm — then stays on WhatsApp for install.

20,000 m²Plant that owns CNC, brake, and PVDF
Scan → CNC1:1 model before the first blank is cut
Long-haul packTickets on the crate, not a bulk coil
WhatsApp deskEngineer on the same drawing as the brake

Integrated digital project solutions

Seven steps used on hospital envelopes and aviation interiors in our own records. The same sequence is what we run for African tenders that need millimetre fits after a long sea leg.

01 Scanning

High-accuracy site data

Send drawings or allow a 3D scan. The point cloud becomes the datum for panel length, fold depth, and joint lines.

02 Reconstruction

1:1 digital twin

Scan or CAD is rebuilt as a model that matches the as-built envelope, not a pretty massing that ignores tolerance.

03 Designing

Panel split on the scene

Unique cassettes, clip-in trays, baffles, or column covers are nested onto the real geometry before anyone hits CNC.

04 Visualization

Confirm the finish

Renderings plus a first-article sample lock alloy, thickness, and PVDF or powder before the production lot.

05 Manufacturing

CNC, brake, coating

20,000 m² Foshan plant: 3003-H14 typically 2.0–3.0 mm, PVDF to AAMA 2605 with dry film ≥ 30 μm, or powder where the brief is soffit class.

06 Supervision

Packing and site support

Lots leave labelled to the shop ticket. A project engineer stays on drawings and WhatsApp for install coordination.

07 Acceptance

Match the approved ticket

Final check is against the signed unfold and sample — not a gallery image. What was approved is what ships.

GIMEEC Health Ark exterior aluminum cassettes

Hospital-class envelope, hot-humid brief

GIMEEC Health Ark is a shaped PVDF envelope we actually folded: box cassettes, corrugated faces, grind and coat in one plant. That is the capability we put against African hospital and clinic envelopes — not a claimed church or airport we did not build. Alloy 3003-H14, typically 2.5–3.0 mm where the return must hold.

Request a free quote

Airport T3 aluminum column and soffit

Aviation interiors that ship as labelled lots

Airport T3 mixed column covers and triangular soffits. Powder or PVDF by zone. For African terminals the constraint is the same: non-standard geometry plus a crate that has to survive the voyage. We nest unique pieces in Foshan, pack by zone, and send the hanging ticket with the lot.

Request a free quote

LINDELACR clip-in metal ceiling in a hospital corridor

Clip-in ceilings for clinics and public hospitals

Clip-in hospital work in our catalogue is demountable, cleanable, and tied to a documented grid. That is the system we quote when a Nairobi, Lagos, Accra, or Johannesburg clinic needs a metal ceiling that maintenance can take down without a wet trade.

Request a free quote

Operators feeding 3003 aluminum sheet into the DeraTech brake in Foshan

Factory hold-point before the sea freight

The person who signed the unfold is in the same building as the brake. First article is checked before the nest. That is how a long-haul African shipment avoids a container of trays that do not meet the as-built scan.

Request a free quote

Planning a complex African landmark?

Send the RCP or a phone scan, city, and whether the face is facade, ceiling, or both. We return unique-count, coating class, and a packing plan.

Get a free project estimate WhatsApp the Foshan desk
Email
Email: lindelacr@lindelacr.com
WhatsApp
(0/8)